DDTC construction

Sovelmash Design and Development Technology Centre (the DDTC) construction is well underway at Alabushevo site. At this DDTC, unique rotating electrical machines of various purposes in accordance with customers’ requirements will be developed.

The DDTC is being built at the 2.1-hectare plot of the Technopolis Moscow special economic zone. Much of the preparatory works have already been completed; the construction permit was obtained. Construction works are well underway in accordance with the project schedule. Although the schedule is based on current realities, it should be noted that it is a plan that can be adjusted depending on various circumstances.

Sovelmash does its utmost to complete construction and put the DDTC into operation on time. All required works are being carried out without delay.

We will inform you about ongoing works here by slides on this page below. Stay tuned for more updates!

The Positive Resolution
Moscow State Expertise. The resolution on documentation and geotechnical investigations
download
The Resolution of Rospotrebnadzor
The resolution of Rospotrebnadzor (Federal Service for Supervision of Consumers Protection) on the establishment of the sanitary protection zone for the Design and Development Technology Centre
download
Lease Agreement
The land lease agreement for the lease of a plot in the Technopolis Moscow special economic zone
download
The Construction Permit
The construction permit No. 77-194000-019196-2020 dated 15.10.2020 issued by the Moscow City Committee for Public Oversight of Construction
download
Resolution of Federal State-Funded Healthcare Institution
Resolution on the compliance of the design, pre-project, normative and technical documentation with technical regulations, state sanitary and epidemiological rules and standards
download
DDTC exterior
The exterior of the Design and Development Technology Centre under construction
download
Prefab labour camp and temporary utilities
Contract signature and documents preparation